Home U.S. Steel Postpones EAF at Fairfield Works
 

Keywords :   


U.S. Steel Postpones EAF at Fairfield Works

2016-01-07 01:08:47| Steel - Topix.net

United States Steel Corp. will postpone construction of the electric arc furnace at its Fairfield Works in Birmingham, Ala., due to the challenging market conditions in both the oil and gas and steel industries. In mid-December, oil prices hit an eight-year low in the same week that rig counts dropped to a 16-year low of 709.

Tags: works steel fairfield postpones

Category:Materials

Latest from this category

All news

»
23.11PlayStationVitaPCH-2000
23.11GB
23.11 Malbon
23.11PING PEARL GATES
23.11WATCH
23.11L
23.11Tetsuya_SP2 DMC
23.116
More »