je.st
news
Tag: span
Morrison Bridge lane closure for lift span inspection
2014-01-27 17:46:27| PortlandOnline
One eastbound lane on the Morrison Bridge will be closed for roughly three weeks starting at 7 a.m. on Sunday, January 26 to allow Multnomah County to begin an inspection of the lift span deck.
Tags: bridge
lane
inspection
lift
Front-End Subsystems span 100 MHz to 6 GHz frequency range.
2014-01-14 14:30:44| Industrial Newsroom - All News for Today
Integrating super heterodyne frequency translator technology, Prism FES Series optimizes operating range, receive sensitivity, and interference rejection characteristics of wireless adapters used in wireless communication standards like WLAN. Full-duplex systems provide complete bi-directional transmit and receive paths from wireless adapter to antenna with 50 Ω input/output matched ports. Operating from -40 to +70°C, systems come in low, medium, and high RF power models up to 30 dBm at 16 QAM. This story is related to the following:Communication Systems and EquipmentSearch for suppliers of: Transceivers | Communication Components & Subsystems
Quick Fix Reopens Outer Banks Span
2013-12-23 18:13:50| ENR.com: Headline News
The Herbert C. Bonner Bridge on North Carolina's Outer Banks has reopened after the discovery of excess scour around underwater pilings forced a two-week closure
Span of Control Summary
2013-12-19 18:58:48| PortlandOnline
12/18/13 BAC Meeting PDF Document, 7kbCategory: BAC Supporting Documents - FY 2014-15
Traffic signal out on NE 82nd Avenue and Fremont Street through tomorrow after high voltage wire contacts signal span
2013-11-26 17:11:30| PortlandOnline
The Portland Bureau of Transportation advises the traveling public that the traffic signal on NE 82nd Avenue and NE Fremont Street is non-functioning and being repaired after a Pacific Power high voltage line landed on the signal span today, destroying the signal circuitry.
Tags: high
street
contacts
avenue
Sites : [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] next »