Home repair
 

Keywords :   


Tag: repair

Sellwood-Moreland Sewer Repair Project Construction Update: December 8, 2015

2015-12-08 23:55:04| PortlandOnline

Environmental Services is repairing or replacing about 25,000 feet of public sewer pipes in the Sellwood-Moreland neighborhood that are between 80 and 100 years old and failing due to age. This project will help protect the public and the environment by reducing the possibility of costly breaks, leaks, blockages and sewage releases to homes, businesses and streets.

Tags: december project update construction

 

SE 34th and Steele Sewer Repair Project Update

2015-12-03 20:43:30| PortlandOnline

Environmental Services is designing a project to replace and upsize a 215-foot segment of public sewer pipe on SE 34th Avenue between SE Steele and SE Insley streets. The public sewer main in SE 34th Avenue is 70 years old, and the concrete service laterals that connect private properties to the sewer main in this segment are deteriorating. Necessary replacement of the sewer pipes will reduce the possibility of costly breaks, sink holes, and sewage releases to homes, businesses and streets.

Tags: project update repair sewer

 
 

St. Johns-Cathedral Park Sewer Repair Project Update

2015-12-03 20:33:24| PortlandOnline

Environmental Services is designing a project to repair up to 36,000 feet, or almost seven miles, of public sewers in the St. Johns and Cathedral Park neighborhoods. Many of the existing sewer pipes are about 80 years old and deteriorating due to age. This project is one of many that will protect the public and the environment by reducing the possibility of sewage releases to homes, businesses and streets.

Tags: project park update repair

 

North Fremont and Kerby Sewer Repair Project: Pipe work is complete

2015-12-03 20:22:33| PortlandOnline

The City of Portland recently completed emergency repairs on a failing sewer pipe on N Fremont Street at N Kerby Avenue. Environmental Services was designing a project to replace the pipe next year, but the emergency repairs have made the project unnecessary.

Tags: work complete north project

 

Solder Joint Repair Clamps fit large copper tube ODs.

2015-12-03 14:31:08| Industrial Newsroom - All News for Today

Available in 5.125 and 6.125 in. CTS OD sizes, Insta-Clamp™ Extended Range S/S Solder Joint Repair Clamps repair solder joints on leaking copper tubes. Units can repair leaks on 45, 90, Tee, or threaded coupling in under 5 minutes, eliminating shut-downs and need to drain system. Made of 304 stainless steel with step-up waffle designed NBR gasket, extended range models are rated to 150 psi for waterworks applications.

Tags: large fit repair joint

 

Sites : [64] [65] [66] [67] [68] [69] [70] [71] [72] [73] [74] [75] [76] [77] [78] [79] [80] [81] [82] [83] next »