Home part
 

Keywords :   


Tag: part

Overcurrent Protection, Part 2

2014-06-10 00:18:00| Electrical Construction & Maintenance

Circuits experience overcurrent due to overload, short circuits, or fault current. What are these, and how do they differ? read more

Tags: part protection overcurrent overcurrent protection

 

Safety: Unsafe Assumptions, Part 7

2014-06-10 00:06:00| Electrical Construction & Maintenance

Electrical testing is an integral part of maintenance, repair, and operations. read more

Tags: part safety assumptions unsafe

 
 

Transient Partial Flow Dilution System complies with Part 1065.

2014-06-09 14:32:14| Industrial Newsroom - All News for Today

Compliant to US EPA 40 CFR Part 1065, BG3 Elite is refined for applications requiring 47 mm filter media. System can accurately measure particulate matter either pre and post catalyst and/or DPF for research or DF testing. BG3 Elite includes patented feature that actively controls diluted sample to off-board measurement device while simultaneously maintaining Part 1065-required metrics for proportionality and filter face velocity required for gravimetric sampling. This story is related to the following:Gas Dilution Systems

Tags: part system flow partial

 

AkzoNobel to Fund OMA Research as Part of Human Cities Initiative

2014-06-09 07:00:00| Coatings World Breaking News

Tags: part research human cities

 

USS Ross moved to Spain as part of Nato plan

2014-06-09 01:00:00| Naval Technology

The US Navys Arleigh Burke-class guided-missile destroyer USS Ross (DDG 71) has been forward deployed to Rota, Spain, from its Norfolk homeport, as part of a Nato ballistic missile defence plan to boost security in the European region.

Tags: part plan spain moved

 

Sites : [386] [387] [388] [389] [390] [391] [392] [393] [394] [395] [396] [397] [398] [399] [400] [401] [402] [403] [404] [405] next »