Home ami
 

Keywords :   


Tag: ami

What is an AMI System?

2021-07-13 16:17:31| Country Lines Online

PIE&Gs Advanced Metering Infrastructure (AMI) system is the latest technology available to utilities to improve the level of customer service, reliability, and outage response. An AMI system is comprised of two main components: the meters/modules, and the communications infrastructure and software system. AMI meters measure energy use and quality, and transmit that information to collector […] The post What is an ‘AMI’ System? appeared first on Michigan Country Lines Magazine.

Tags: system ami

 

Modernizing Our Aging Power Grid For The 21st Century: AMI

2020-07-02 20:48:56| Country Lines Online

PIE&G is committed to providing our members with electricity that is both reliable and affordable. To continue doing that, we must make improvements to bring our aging power grid into the 21st century. Utilities across the nation are facing a similar challenge, and we want to keep our members updated on what these next upgrades will […] The post Modernizing Our Aging Power Grid For The 21st Century: AMI appeared first on Michigan Country Lines Magazine.

Tags: power century ami grid

 
 

Benefits Emerge From AMI Rollout

2020-07-01 22:18:45| Country Lines Online

Last year TEC began the transition to automated metering infrastructure (AMI) because of the many benefits it offers. Today we have converted nearly 10% of our system over and we are beginning to see the benefits firsthand. Take a look at how the system is already delivering on its expected benefits. Expected Benefit With data from […] The post Benefits Emerge From AMI Rollout appeared first on Michigan Country Lines Magazine.

Tags: benefits ami emerge rollout

 

Women In Energy: Ami Arief, Tellurian

2020-03-10 10:30:00| OGI

Todays featured 25 Influential Women in Energy honoree is Ami Arief, senior vice president of Tellurian Production LLC based in Houston.

Tags: women energy ami tellurian

 

Thumb Electric AMI Implementation To Begin

2019-11-05 19:35:40| Country Lines Online

Starting in late fall or early winter, Thumb Electric Cooperative (TEC) will begin installing equipment for its Advanced Metering Infrastructure (AMI) system. Only members served from the Ubly Substation circuits will be part of the initial deployment. The initial deployment phase will allow us to test and work through any problems that could occur with […] The post Thumb Electric AMI Implementation To Begin appeared first on Michigan Country Lines Magazine.

Tags: begin electric implementation ami

 

Sites : [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] next »