je.st
news
Tag: completes
American Crane Completes the First Lift for Orion
2014-07-16 06:00:00| Industrial Newsroom - All News for Today
American Crane & Equipment Corporation's overhead clean room crane helped to lift and stack the Orion crew module. The stacking took place inside the Final Assembly and System Test (FAST) cell inside the Operations and Checkout facility at Kennedy Space Center.<br /> <br /> Early last month, American Crane's 25 ton double girder clean room crane (with single failure-proof hoist) strategically lifted and placed Lockheed Martin's Orion crew module atop their service module. This custom overhead ...This story is related to the following:Laboratory and Research Supplies and EquipmentSearch for suppliers of: Double Girder Cranes |
Tags: american
lift
crane
orion
Telefonica completes Ireland exit
2014-07-16 02:00:00| Total Telecom industry news
Spanish incumbent to receive 850 million from local rival Hutch for O2.
Tags: ireland
exit
completes
telefonica
Raytheon SeaGriffin(TM) Completes Guided Flight Test with New Dual-mode Seeker
2014-07-14 06:00:00| Industrial Newsroom - All News for Today
Enhanced missile will counter swarming boat threat<br /> <br /> LONDON - Raytheon Company (NYSE: RTN) successfully completed the latest guided flight test of its SeaGriffin™ missile. The test further demonstrated the effectiveness of SeaGriffin's semi-active laser guidance system, and the missile's ability to capture images from a newly-added imaging infrared seeker (IIR).<br /> <br /> During the Raytheon-funded test, a SeaGriffin missile, launched from an integrated surface launch ...This story is related to the following:Missile Systems & Components |
Tags: test
flight
seeker
guided
Lockheed completes environmental testing of US Navys third MUOS satellite
2014-07-14 01:00:00| Naval Technology
Lockheed Martin has successfully completed environmental testing of the third mobile user objective system (MUOS) satellite for the US Navy.
Tags: testing
environmental
satellite
completes
Tetra Pak completes Brazil packaging plant upgrade
2014-07-11 01:00:00| Packaging Gateway
Swedish food packaging and processing company Tetra Pak has completed a 65m upgrade of its packaging material plant located in Ponta Grossa, Brazil.
Tags: brazil
plant
upgrade
packaging
Sites : [399] [400] [401] [402] [403] [404] [405] [406] [407] [408] [409] [410] [411] [412] [413] [414] [415] [416] [417] [418] next »