Home installation requirements
 

Keywords :   


Tag: installation requirements

Mini-Split Installation Support Tool reduces labor requirements.

2015-01-20 14:30:45| Industrial Newsroom - All News for Today

Supporting up to 100 lb, Mighty Bracket™ fits most mini-split sizes and enables hands-free, single-person installation of evaporator coil. Reusable bracket, constructed of ABS plastic, hooks onto both tabs of mini-split wall mounting plate in <1 min and holds mini-split evaporator coil for electrical, refrigeration line, and condensate drain pump/hose connections. Due to 20 in. long support arms, evaporator coils can be temporarily angled away from wall at 23° to 45° for back panel access.

Tags: support requirements tool installation

 

Code Quiz: Neutral Conductor Installation Requirements

2013-12-05 17:51:00| Electrical Construction & Maintenance

By Steven Owen, National Code Seminars Disregarding exceptions, where more than one neutral conductor associated with different circuits is in an enclosure, grounded circuit conductor(s) of each circuit shall be identified or grouped to correspond with the ungrounded circuit conductor(s) by methods such as ______________ in at least one location within the enclosure. read more

Tags: code requirements installation quiz

 

Sites : [1] [2]