je.st
news
Tag: design update
Southeast Interceptor Sewer Repair Project: Design update
2016-02-19 22:55:20| PortlandOnline
Environmental Services is designing a project in inner southeast Portland to repair a deep interceptor sewer line that is deteriorating due to age. The project will extend the life of the sewer and protect public health, water quality and the environment. The city built the large-diameter Southeast Interceptor in 1954. It runs parallel to the Willamette River under inner southeast neighborhoods at depths ranging from 30 to 54 feet.
Tags: design
project
update
repair
SE Hemlock and Harrison Alley Sewer Repair Project Update: Design is nearing completion
2016-01-13 17:54:07| PortlandOnline
Environmental Services is nearly finished designing the SE Hemlock and Harrison Alley Sewer Repair Project. This project will replace 470 feet of 120-year-old public sewer pipes in the alley, install 430 feet of new sewer under the small rose garden east of Ladds Circle, and abandon 200 feet of sewer pipe between two properties on SE Cypress Avenue. This project will increase sewer capacity and reduce the risks of basement flooding and sewage releases to homes and streets.
Tags: design
project
update
repair
2015 Urban Design Direction (Comprehensive Plan Update)
2015-09-24 19:37:56| PortlandOnline
Illustrates how the city intends to grow, how people will experience the public spaces within it and how different places in the city can be enhanced
Tags: design
plan
update
direction
Apple may update iPad design this spring, analyst says
2013-02-15 18:08:11| CNET News.com
Piper Jaffray analyst Gene Munster believes Apple will redesign the larger iPad to make its body similar to the iPad Mini. But he doesn't expect any major products this spring. [Read more]
Tags: design
update
says
spring