je.st
news
Tag: july
SE Hawthorne-Salmon Area Green Street and Sewer Project: July 25, 2016
2016-07-27 23:53:56| PortlandOnline
Environmental Services continues construction on the SE Hawthorne-Salmon Area Green Street and Sewer Project. The project includes installing 23 green street planters, planting 100 street trees, and repairing or replacing over 10,000 feet of public sewer pipe. These improvements will extend the service life of our sewer system and protect public health, property and the environment by reducing the possibility of sewage releases into streets, homes and businesses.
Tags: area
july
street
project
Piedmont Sewer Repair Project Update: July 27, 2016
2016-07-27 23:40:38| PortlandOnline
Construction hours are from 7:00 a.m. to 6:00 p.m. Monday through Friday.
Tags: july
project
update
repair
Citywide Maximum Building Heights (July, 2016)
2016-07-27 23:13:46| PortlandOnline
Full color 44x34 map of maximum building heights with street centerlines. You will need to zoom in to see details. (See Zoning Code section 500 for detailed Plan District maps). PDF Document, 2,873kbCategory: Maps
Tags: july
maximum
building
heights
Playground Layout - July 2016
2016-07-27 23:02:35| PortlandOnline
PDF Document, 591kbCategory: North Park Blocks
Tags: july
layout
playground
Required Seismic Certification and Special Inspections for Nonstructural Components and Designated Seismic Systems Effective July 1, 2017
2016-07-27 19:13:40| PortlandOnline
Effective July 1, 2017 the Bureau of Development Services (BDS) will start implementing the provisions of the 2014 Oregon Structural Specialty Code (OSSC) section 1705.11.4 requiring special inspections of designated seismic systems and section 1705.12.3 requiring seismic certification of certain nonstructural components for structures designated as Risk Category III or IV.
Tags: special
required
july
systems
Sites : [299] [300] [301] [302] [303] [304] [305] [306] [307] [308] [309] [310] [311] [312] [313] [314] [315] [316] [317] [318] next »