Home 48 Hour Equipment Mobilization From Claxton Prevents Rig Down Time
 

Keywords :   


48 Hour Equipment Mobilization From Claxton Prevents Rig Down Time

2013-07-31 05:40:48| oilandgasonline News Articles

Claxton Engineering Services Ltd, an Acteon company, successfully responded to an urgent call to mend a rig diverter’s connection by providing a 30” dual seal overshot, a 30” casing cutter and personnel to oversee operations and requirements within 48 hours.

Tags: time equipment hour prevents

Category:Energy and Environment

Latest from this category

All news

02.07Greyparrot and VAN DYK Bring AI to MRFs Across the U.S.
02.07Grove Collaborative Announces New Sustainability Goals, Recommits to Moving the Industry Beyond Plastic
02.07Aldi Chops Off Pineapple Crowns in a New Trial to Save 1,400 Tonnes of Food Waste
02.07Virginia Waste-to-Energy Plant Closes, Waste Now Heading for Landfill That is Running Out of Space
02.07Trashion Puts Upcycling in the Spotlight at WasteExpo 2024
01.07Heil Continues Growth of Nationwide Dealer Network With New Locations in Ohio and Michigan
01.07Heil Expands Nationwide Dealer Network With New Facility, Servicing Iowa and Nebraska
01.07Heil Strengthens Nationwide Dealer Network With New Locations in Wisconsin and Minnesota
Energy and Environment »
03.07Hurricane Beryl Graphics
03.07Hurricane Beryl Forecast Discussion Number 18
03.07Hurricane Beryl Wind Speed Probabilities Number 18
03.07Hurricane Beryl Public Advisory Number 18
03.07Summary for Hurricane Beryl (AT2/AL022024)
03.07Hurricane Beryl Forecast Advisory Number 18
03.07Hurricane Beryl Graphics
03.07Atlantic Tropical Weather Outlook
More »