Home B.E.S. Columbia Building: Scope additions and ineffective design oversight led to substantially higher project costs (Report 446B) - 10/22/14 (PDF Document, 1,769 kb)
 

Keywords :   


B.E.S. Columbia Building: Scope additions and ineffective design oversight led to substantially higher project costs (Report 446B) - 10/22/14 (PDF Document, 1,769 kb)

2014-10-22 17:25:57| PortlandOnline

An audit of design, construction and costs of the Columbia Building at the Portland Wastewater Treatment Plant campus

Tags: pdf report design document

Category:Construction and Maintenance