Home BP completes installation of topside modules on Clair Ridge platform
 

Keywords :   


BP completes installation of topside modules on Clair Ridge platform

2015-06-26 01:00:00| Offshore Technology

BP has completed the installation of the new quarters and utilities (QU) topside modules on the Clair Ridge project, an investment in the second phase of development on the Clair field, located 75km to the west of the Shetland Islands.

Tags: installation modules platform ridge

Category:Energy and Environment

Latest from this category

All news

04.11WM Receives Approval from Canada for Stericycle Acquisition
04.11Western Australian State Government Awards Grant to Livium for EV Battery Recycling Plant
04.11ABCRC Selects Diversys to Digitize Albertas Beverage Container Recovery and Recycling Program
04.11Pennsylvania American Water Acquires Sadsbury Township Wastewater Collection System
04.11Santa Barbara County Co-Locates Dirty MRF, Anaerobic Digester, and Compost
04.11Waste World Episode 4: Using Social Media to Educate Audiences About Waste and Recycling
01.11Heritage Environmental Services Secures Commercial Permit Status for Orange, TX Incinerator
01.11Gimme Seaweed Partners with rePurpose Global to Combat Plastic Pollution
Energy and Environment »
05.11Registration Now Open for RadTech 2025
05.11Atlantic Tropical Weather Outlook
05.11Eastern North Pacific Tropical Weather Outlook
05.11Tropical Storm Rafael Graphics
05.11Tropical Storm Rafael Public Advisory Number 7A
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
05.11Vodafone-Three merger could get green light, watchdog says
05.11Altice USA residential video RGUs down 77,000 in 3Q 2024
More »