Home Burnside Bridge inspection will require daytime lane closure through Oct. 16
 

Keywords :   


Burnside Bridge inspection will require daytime lane closure through Oct. 16

2015-10-14 23:40:34| PortlandOnline

An inspection of the Burnside Bridge will require one traffic lane to be closed on the bridge at times through Friday, October 16. The closed lane will not be in the peak travel direction. The lane closure will typically be between 7 am and 3:30 pm. When the outside lane is closed for the inspection truck, the bike lane will be re-routed into the closed traffic lane with traffic cones. The inspection will gather information for a rehabilitation project scheduled for construction in 2017-2018.

Tags: oct require bridge lane

Category:Construction and Maintenance

Latest from this category

All news

»
23.11 BUG ! TOO !
23.11BTS 10 FESTA ARMY JUNGKOOK
23.11 SAO 2015
23.1178580g
23.112
23.1170
23.11 BOX
23.11
More »