je.st
news
Candente Gold Corp.: High Gold and Silver Grades Confirmed for the El Oro Mine Tailings
2014-06-26 11:17:05| Paper - Topix.net
An average grade of 2.95 grams per tonne gold and 60.70 g/t silver was obtained from the 101 auger/vertical channel samples collected from the Mexico Mine Tailings dump at the El Oro Project.
Tags: high
gold
silver
mine
Category:Materials
Latest from this category |
All news |
||||||||||||||||||||
|
|