je.st
news
Code Quiz: Handhole Enclosure Requirements
2014-11-20 00:05:44| Electrical Construction & Maintenance
With respect to wiring entries, such as a schedule 80 PVC raceway installed underground entering into a handhole enclosure, a schedule 80 PVC raceway shall be mechanically and electrically connected to the handhole enclosure by ______. read more
Tags: code
requirements
quiz
enclosure
Category:Construction and Maintenance
Latest from this category |
All news |
||||||||||||||||||||
|
|