Home Code Quiz: Pull and Junction Requirements
 

Keywords :   


Code Quiz: Pull and Junction Requirements

2014-11-06 15:55:00| Electrical Construction & Maintenance

Fill in the blank with the appropriate answer. When installing junction and pull boxes for conductors operating at over 1,000V, the junction or pull boxes shall have sides ______. A. that are spot-welded to form good mechanical and electrical continuity. B. that have concentric or eccentric knockouts. C. (one or more)  that are removable. D. that are bonded with a separate bonding jumper. Find the Answer Answer: C read more

Tags: code requirements pull quiz

Category:Construction and Maintenance

Latest from this category

All news

»
23.11
23.11 85
23.11DANCEWITHDRAGON2 811
23.11 N5000VSE
23.11EZY POWER EDIT6
23.11RR4
23.1126.5 HG
23.11VISSLA
More »