Home Code Quiz: Pull and Junction Requirements
 

Keywords :   


Code Quiz: Pull and Junction Requirements

2014-11-06 15:55:00| Electrical Construction & Maintenance

Fill in the blank with the appropriate answer. When installing junction and pull boxes for conductors operating at over 1,000V, the junction or pull boxes shall have sides ______. A. that are spot-welded to form good mechanical and electrical continuity. B. that have concentric or eccentric knockouts. C. (one or more)  that are removable. D. that are bonded with a separate bonding jumper. Find the Answer Answer: C read more

Tags: code requirements pull quiz

Category:Construction and Maintenance

Latest from this category

All news

»
05.07Tropical Storm Beryl Potential Storm Surge Flooding Map
05.07Tropical Storm Beryl Probabilistic Storm Surge Graphics
05.07Tropical Storm Beryl Storm Surge Watch/Warning Map
05.07Tropical Storm Beryl Storm Surge Watch/Warning Map
05.07Tropical Storm Beryl Graphics
05.07Tropical Storm Beryl Graphics
05.07Tropical Storm Beryl Forecast Discussion Number 29
05.07Tropical Storm Beryl Wind Speed Probabilities Number 29
More »