je.st
news
Code Quiz: Pull and Junction Requirements
2014-11-06 15:55:00| Electrical Construction & Maintenance
Fill in the blank with the appropriate answer. When installing junction and pull boxes for conductors operating at over 1,000V, the junction or pull boxes shall have sides ______. A. that are spot-welded to form good mechanical and electrical continuity. B. that have concentric or eccentric knockouts. C. (one or more) that are removable. D. that are bonded with a separate bonding jumper. Find the Answer Answer: C read more
Tags: code
requirements
pull
quiz
Category:Construction and Maintenance