Home Commission cuts solar, wind power contracts to 5 years
 

Keywords :   


Commission cuts solar, wind power contracts to 5 years

2015-02-06 21:02:00| Energy - Topix.net

The Idaho Public Utilities Commission has reduced the length of federally mandated contracts Idaho Power signs with renewable energy projects such as solar and wind from 20 years to five years. The commissioners on Thursday approved the change that will be in place until the commission decides on an Idaho Power request to reduce the contract length to two years.

Tags: years power commission wind

Category:Energy and Environment

Latest from this category

All news

04.10Republic Services Orders 100 McNeilus Volterra Electric Refuse Trucks
04.10Divert Inc. Expands Executive Leadership Team with VP of Environment, Health and Safety Hire
04.10Ameresco, Republic Services and PG&E Celebrate the Opening of California's Largest Landfill Gas to Renewable Natural Gas Plant
03.10Lakeshore Recycling Systems (LRS) Releases First Annual Sustainability Report
03.10Better Earth Acquires Betterbin
03.10Elementary School Students Compete to Win in 2 Million Cans Recycling Contest
03.10Capital Waste Acquires Dumpster Depot
03.10EREF Awards 18 Scholarships to Graduate Students Advancing Environmental Research
Energy and Environment »
06.10Glatfelter Develops Biobased Espresso Lid Material
06.10Tropical Storm Milton Potential Storm Surge Flooding Map
06.10Tropical Storm Milton Probabilistic Storm Surge Graphics
06.10Firms urge mayor to rethink congestion charge plan
06.10Tropical Storm Milton Public Advisory Number 5
06.10Summary for Tropical Storm Milton (AT4/AL142024)
06.10Tropical Storm Milton Graphics
06.10Tropical Storm Milton Graphics
More »