Home Crossrail manufactures final concrete segment for eastern twin tunnels
 

Keywords :   


Crossrail manufactures final concrete segment for eastern twin tunnels

2014-07-23 01:00:00| Railway Technology

Crossrail has manufactured the last of its 250,000 concrete segments, which will be used to line the 12km-long eastern twin tunnels connecting east London and Farringdon.

Tags: final eastern concrete twin

Category:Transportation and Logistics

Latest from this category

All news

19.05Atlantic Tropical Weather Outlook
19.05Eastern North Pacific Tropical Weather Outlook
18.05Eastern North Pacific Tropical Weather Outlook
18.05Atlantic Tropical Weather Outlook
18.05Eastern North Pacific Tropical Weather Outlook
18.05Atlantic Tropical Weather Outlook
18.05Eastern North Pacific Tropical Weather Outlook
18.05Atlantic Tropical Weather Outlook
Transportation and Logistics »
19.05Fujitsu sacked boss at height of Horizon scandal
19.05Atlantic Tropical Weather Outlook
19.05Eastern North Pacific Tropical Weather Outlook
18.05Eastern North Pacific Tropical Weather Outlook
18.05Atlantic Tropical Weather Outlook
18.05M&S website and app hit by technical issue
18.05Eastern North Pacific Tropical Weather Outlook
18.05Atlantic Tropical Weather Outlook
More »