Home DNR says work moving forward on wetland-enhancement project
 

Keywords :   


DNR says work moving forward on wetland-enhancement project

2015-11-18 15:13:34| Waste Management - Topix.net

The state Department of Natural Resources says work is expected to start after Dec. 1 at Cannon Creek Number 1 Flooding State Wildlife Management Area in Missaukee County's Norwich Township or will begin following snowmelt in the spring. A water-control structure that failed a state Department of Environmental Quality dam safety inspection in 2013 will be replaced.

Tags: work project forward moving

Category:Energy and Environment

Latest from this category

All news

02.07Greyparrot and VAN DYK Bring AI to MRFs Across the U.S.
02.07Grove Collaborative Announces New Sustainability Goals, Recommits to Moving the Industry Beyond Plastic
02.07Aldi Chops Off Pineapple Crowns in a New Trial to Save 1,400 Tonnes of Food Waste
02.07Virginia Waste-to-Energy Plant Closes, Waste Now Heading for Landfill That is Running Out of Space
02.07Trashion Puts Upcycling in the Spotlight at WasteExpo 2024
01.07Heil Continues Growth of Nationwide Dealer Network With New Locations in Ohio and Michigan
01.07Heil Expands Nationwide Dealer Network With New Facility, Servicing Iowa and Nebraska
01.07Heil Strengthens Nationwide Dealer Network With New Locations in Wisconsin and Minnesota
Energy and Environment »
02.07Chattanooga Area High School Students Graduate from BASFs TECH Academy
02.07Fayette Pipe Transforms Black Steel Pipe with FayetteGuard
02.07Automotive Coatings to Reach $19B by 2028: MarketsandMarkets
02.07M13 Graphics invests in Landa digital press
02.07ABG helps Nordvalls increase productivity
02.07Tesla sales rise sharply after slump
02.07Hurricane Beryl Graphics
02.07Hurricane Beryl Forecast Discussion Number 16
More »