Home Fukushima operator struggles to build ice wall to contain radioactive water
 

Keywords :   


Fukushima operator struggles to build ice wall to contain radioactive water

2014-06-17 12:16:00| Climate Ark Climate Change & Global Warming Newsfeed

Agence France-Presse: The operator of Japan's battered Fukushima nuclear power plant has said it is having trouble with the early stages of an ice wall being built under broken reactors to contain radioactive water. Tokyo Electric Power (Tepco) has begun digging the trenches for a huge network of pipes under the plant through which it intends to pass refrigerant. This will freeze the soil and form a physical barrier that is intended to prevent clean groundwater flowing down mountainsides from mixing with contaminated...

Tags: water build wall ice

Category:Electronics and Electrical

Latest from this category

All news

»
05.11Tropical Storm Rafael Graphics
05.11Tropical Storm Rafael Forecast Discussion Number 6
05.11Tropical Storm Rafael Wind Speed Probabilities Number 6
05.11Tropical Storm Rafael Public Advisory Number 6
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
05.11Tropical Storm Rafael Forecast Advisory Number 6
05.11Why colouring clothes has a big environmental impact
05.11Atlantic Tropical Weather Outlook
More »