je.st
news
Morrison Bridge to close Sunday for traffic control change
2014-04-24 23:35:30| PortlandOnline
All traffic lanes on the Morrison Bridge will reopen after a bridge closure this Sunday, April 27 from 7 a.m. until as late as 7 p.m. On Sunday crews will inspect the lift span deck and reopen the two traffic lanes that were closed last month. The lanes were closed to help the County investigate problems with the lift span deck panels that were installed in 2011 2012.
Tags: change
close
control
sunday
Category:Construction and Maintenance
Latest from this category |
All news |
||||||||||||||||||||
|
|