Home Spray Applied Waterproofing System Allows Boston Tunnel To Open Ahead Of Schedule
 

Keywords :   


Spray Applied Waterproofing System Allows Boston Tunnel To Open Ahead Of Schedule

2014-03-14 06:28:36| surfacefinishing News Articles

The 53-year-old Callahan Tunnel was closed shortly after Christmas 2013 for a multimillion dollar renovation project. The floor had badly deteriorated, and after a wall panel fell in 2012, many more were soon discovered to be defective

Tags: system open schedule applied

Category:Materials

Latest from this category

All news

»
23.11()PC-88015\"2D
23.11180&100m
23.11kenG
23.11ps3 CECH-4300C HDMI500
23.11 UNDERTALE PIANO SCORE
23.11MM6 BM11-SEC3 LC
23.11
23.11Blu-ray
More »