Home US Navys first F-35C fleet to soon complete final at-sea developmental test phase
 

Keywords :   


US Navys first F-35C fleet to soon complete final at-sea developmental test phase

2016-08-30 01:00:00| Naval Technology

The US Navys first fleet of seven F-35C Lightning II Joint Strike Fighter aircraft is set to successfully complete the third and final round of at-sea developmental testing, DT-III, aboard the Nimitz-class nuclear-powered aircraft carrier USS George

Tags: complete test final phase

Category:Transportation and Logistics

Latest from this category

All news

05.11Tropical Storm Rafael Graphics
05.11Tropical Storm Rafael Wind Speed Probabilities Number 7
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
05.11Tropical Storm Rafael Public Advisory Number 7
05.11Tropical Storm Rafael Forecast Advisory Number 7
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
05.11Tropical Storm Rafael Public Advisory Number 6A
05.11Tropical Storm Rafael Graphics
Transportation and Logistics »
05.11Tropical Storm Rafael Graphics
05.11Tropical Storm Rafael Wind Speed Probabilities Number 7
05.11Tropical Storm Rafael Public Advisory Number 7
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
05.11Tropical Storm Rafael Forecast Advisory Number 7
05.11Boeing strike ends as workers back 38% pay rise deal
05.11Tropical Storm Rafael Public Advisory Number 6A
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
More »