Environmental Services is designing a project to replace a deteriorating, 12-inch pipe which conveys stormwater runoff from a central eastside neighborhood to the Willamette River. The existing pipe runs from the intersection of SE Water Avenue and Clay Street to the river. Replacing the pipe will reduce the risk of leaks and backups. Environmental Services is still designing the project, including the alignment of the new pipe.