Home Weaker Bolts in Arena's Prefabricated Facade Assembly Pose No Threat to Safety
 

Keywords :   


Weaker Bolts in Arena's Prefabricated Facade Assembly Pose No Threat to Safety

2013-01-09 18:47:33| ENR.com: Headline News

After a discovery that under-strength bolts were installed in error within the prefabricated latticework assemblies of Brooklyns Barclays Center, crews had to replace only 1,768 with the higher-strength bolts originally specified. There are 23,351 bolts in the system.

Tags: to safety assembly threat

Category:Construction and Maintenance

Latest from this category

All news

»
20.05Ryanair profits surge after fares climb by 20%
20.05Vidzemes TV expands with PlayBox Neo Channel-in-a-Box playout
20.05ocilion enhances user experience with Simply.TV metadata
20.05Vantiva RDK device shipments exceed 125 million
20.05VinFast first with Sony Pictures in-car service
20.05LG Ad Solutions to adopt Unified ID 2.0
20.05Eastern North Pacific Tropical Weather Outlook
20.05Atlantic Tropical Weather Outlook
More »