je.st
news
Weaker Bolts in Arena's Prefabricated Facade Assembly Pose No Threat to Safety
2013-01-09 18:47:33| ENR.com: Headline News
After a discovery that under-strength bolts were installed in error within the prefabricated latticework assemblies of Brooklyns Barclays Center, crews had to replace only 1,768 with the higher-strength bolts originally specified. There are 23,351 bolts in the system.
Tags: to
safety
assembly
threat
Category:Construction and Maintenance
Latest from this category |
All news |
||
|