Home Weaker Bolts in Arena's Prefabricated Facade Assembly Pose No Threat to Safety
 

Keywords :   


Weaker Bolts in Arena's Prefabricated Facade Assembly Pose No Threat to Safety

2013-01-09 18:47:33| ENR.com: Headline News

After a discovery that under-strength bolts were installed in error within the prefabricated latticework assemblies of Brooklyns Barclays Center, crews had to replace only 1,768 with the higher-strength bolts originally specified. There are 23,351 bolts in the system.

Tags: to safety assembly threat

Category:Construction and Maintenance

Latest from this category

All news

»
15.11Tropical Storm Sara Graphics
15.11Tropical Storm Sara Forecast Discussion Number 8
15.11Tropical Storm Sara Wind Speed Probabilities Number 8
15.11Tropical Storm Sara Public Advisory Number 8
15.11 20213 105S P7905-P
15.11 ()
15.11Mizuno Energy 25.5
15.11
More »