Home Wood Group GTS Completes $800,000 two x 73MW Generator Control System Upgrades
 

Keywords :   


Wood Group GTS Completes $800,000 two x 73MW Generator Control System Upgrades

2013-09-19 01:00:00| Power Technology

Wood Group GTS has completed a $800,000 contract under Genesys Control, their main automation contractor, upgrading two MHI 73MW steam turbine generators as part of a major automation migration effort of the Electroguayas, Gonzalo Zevallos power gene

Tags: system group control wood

Category:Energy and Environment

Latest from this category

All news

03.07Call2Recycle Launches Battery Recycling Program in Nova Scotia, Canada
03.07Hydrovolt Set to Open Battery Recycling Facility in Frances Battery Valley
03.07Eastmans Announces Molecular Recycling Facility Using Thermal Battery Tech in Texas
03.07EPAs PFAS Hazardous Substance Rule on the Horizon
03.07This Month in Waste: Top Stories for June 2024
02.07Greyparrot and VAN DYK Bring AI to MRFs Across the U.S.
02.07Grove Collaborative Announces New Sustainability Goals, Recommits to Moving the Industry Beyond Plastic
02.07Aldi Chops Off Pineapple Crowns in a New Trial to Save 1,400 Tonnes of Food Waste
Energy and Environment »
06.07Tropical Storm Beryl Potential Storm Surge Flooding Map
06.07Tropical Storm Beryl Probabilistic Storm Surge Graphics
06.07Tropical Storm Beryl Forecast Discussion Number 30
06.07Tropical Storm Beryl Graphics
06.07Tropical Storm Beryl Storm Surge Watch/Warning Map
06.07Summary for Tropical Storm Beryl (AT2/AL022024)
06.07Tropical Storm Beryl Forecast Advisory Number 30
06.07Post-Tropical Cyclone Aletta Graphics
More »