je.st
news
Tag: sewer
2015-2016 Sewer and Drainage Rates and Charges
2015-07-22 00:25:47| PortlandOnline
PDF Document, 663kbCategory: Fiscal Year 2015-2016 Sewer Rates
Tags: rates
charges
drainage
sewer
SE 20th and Haig Sewer Construction Update: July 15, 2015
2015-07-15 19:29:58| PortlandOnline
Environmental Services continues construction on a project to replace aging sewer pipes on SE 20th Avenue from SE Lafayette to Haig streets, and on SE Haig Street from SE 20th to 18th avenues. The pipes are over 100 years old and in poor condition. The project will protect the public and the environment by reducing the possibility of costly breaks, leaks, blockages and sewage releases to homes, businesses and streets.
Tags: july
update
construction
20th
Sellwood-Moreland Sewer Rehab Project Construction Update: July 15, 2015
2015-07-15 18:59:54| PortlandOnline
Several neighbors have asked about whether sewer construction will get in the way of upcoming community events, such as the Bridge Pedal, Passport to Sellwood, and the Tilikum Crossing Sunday Parkways event. We have coordinated with event planners, and studied the routes for these events. Barring construction emergencies, our crews will avoid scheduling work in locations that will interfere with these important community occasions.
Tags: july
project
update
construction
SE Division Place and 6th Avenue Sewer Replacement Project Update: July 10, 2015
2015-07-13 22:37:21| PortlandOnline
Environmental Services your sewer and stormwater service provider will replace and upsize about 270 feet of public sewer pipes on SE Division Place between SE 6th and SE 7th avenues. The pipes are between 95 and 106 years old. This project will increase sewer capacity and reduce the risks of sewage releases to homes and streets.
Tags: place
july
project
update
Balch Consolidated Conduit Support Sewer Replacement Project Update
2015-07-09 20:39:53| PortlandOnline
Environmental Service has completed designing a project that will replace and abandon pipes in poor condition and relieve street flooding and basement sewer backups in the area bounded by NW Yeon Avenue, NW 29th Avenue, NW Nicolai Avenue, and NW St. Helens Road. The project includes diverting stormwater to the Balch Consolidation Conduit sewer pipe, and replacing dams in the Balch Outfall pipe to prevent Willamette River water from backing up into the pipe during heavy rain events.
Tags: support
project
update
replacement
Sites : [78] [79] [80] [81] [82] [83] [84] [85] [86] [87] [88] [89] [90] [91] [92] [93] [94] [95] [96] [97] next »