Home nec
 

Keywords :   


Tag: nec

Moving Violations Video No. 64, by Russ LeBlanc, NEC Consultant: Surface Extension

2014-01-23 06:00:00| Electrical Construction & Maintenance

In this episode, Russ questions the design of this wiring extension and its accompanying ceiling-mounted box. He identifies this as a violation of Section 314.22 of the 2014 NEC. read more

Tags: video moving surface extension

 

The NEC and CATV/Radio Distribution Systems

2014-01-16 23:42:13| Electrical Construction & Maintenance

By Mike Holt, NEC Consultant While Art. 810 provides the requirements for transmission or reception via an antenna, Art. 820 provides the requirements for the distribution of television and radio signals within a facility or on a property via cable. read more

Tags: systems distribution nec

 
 

NEC Teams With SAP to Help SMEs Benefit from Cloud-Based ERP Solutions in Key Markets Globally

2014-01-15 06:00:00| Industrial Newsroom - All News for Today

NEC to Roll Out New Solution Package Built on SAP® Business ByDesign®, Empowering Small and Midsize Enterprises Initially Across South East Asia to Run Their Entire Businesses More Efficiently<br /> <br /> TOKYO &mdash; NEC and SAP AG (NYSE: SAP) today announced that NEC has entered into an original equipment manufacturer (OEM) agreement with SAP to integrate the SAP® Business ByDesign® solution with its global cloud-based enterprise resource planning (ERP) services. The new offering, NEC ...This story is related to the following:Web-Based Software |

Tags: key solutions benefit markets

 

Moving Violations Video No. 63, by Russ LeBlanc, NEC Consultant: Means of Support

2014-01-08 06:00:00| Electrical Construction & Maintenance

In this episode, EC&M Magazine's NEC consultant Russ LeBlanc shows us how someone improperly strapped a bunch of extra cables to a metal conduit run and violated the rules of 300.11(B) on the 2014 NEC. read more

Tags: of video support means

 

Moving Violations Video No. 62, by Russ LeBlanc, NEC Consultant: Improper Use of Flexible Cord

2013-12-18 06:00:00| Electrical Construction & Maintenance

In this episode, Russ points out a wiring violation with this outdoor sign. Flexible cord was improperly used in a wet location and as a substitute for a permanent wiring method. This is a violation of 400.8. read more

Tags: of video moving flexible

 

Sites : [55] [56] [57] [58] [59] [60] [61] [62] [63] [64] [65] [66] [67] [68] [69] [70] [71] [72] [73] [74] next »