je.st
news
Tag: burnside bridge
Westbound lane on Burnside Bridge to be closed at off-peak hours for utility work
2017-07-10 19:54:33| PortlandOnline
Short sections of the outside westbound lane on the Burnside Bridge will be closed at off-peak travel times from July 12 - August 31, 2017 so that Century Link can upgrade utility conduits on the bridge.
Tags: work
hours
closed
bridge
Burnside Bridge
2016-11-22 20:07:53| PortlandOnline
Construction - Repair work up to 9 weekends between 10/1/2017 and 11/30/2019 PDF Document, 1,483kbCategory: Northwest and Inner Southwest Portland (NWNW)
Tags: bridge
burnside
burnside bridge
Burnside Bridge closed Saturday for Rose Parade
2016-06-07 18:33:13| PortlandOnline
The Burnside Bridge will close to motor vehicle and river traffic on Saturday, June 11 from 7 a.m. until 2 p.m. for the Portland Rose Festivals Grand Floral Parade. TriMet bus lines 12-Sandy, 19-Glisan and 20-Burnside will be detoured across the Steel Bridge during the bridge closure. Bridge sidewalks will remain open. Alternate river crossings when the Burnside Bridge is closed include the Hawthorne and Morrison bridges.
Tags: saturday
closed
rose
bridge
Oregonian: Multnomah County takes first step in Burnside Bridge retrofit or replacement
2015-11-06 15:54:06| PortlandOnline
News story posted to oregonlive.com November 5, 2015.
Burnside Bridge inspection will require daytime lane closure through Oct. 16
2015-10-14 23:40:34| PortlandOnline
An inspection of the Burnside Bridge will require one traffic lane to be closed on the bridge at times through Friday, October 16. The closed lane will not be in the peak travel direction. The lane closure will typically be between 7 am and 3:30 pm. When the outside lane is closed for the inspection truck, the bike lane will be re-routed into the closed traffic lane with traffic cones. The inspection will gather information for a rehabilitation project scheduled for construction in 2017-2018.