je.st
news
Home
› Ajax TOCCO Delivered (4) Four Portable Induction Bolt Heating Systems for On-Site Maintenance Service of Large Gas Turbines
Ajax TOCCO Delivered (4) Four Portable Induction Bolt Heating Systems for On-Site Maintenance Service of Large Gas Turbines
2015-05-12 12:31:16| Industrial Newsroom - All News for Today
During the maintenance of large gas turbines, technicians must remove large bolts which have become corroded and difficult to unfasten. Typically a large cumbersome hydraulic wrench is required to provide the 6800 Nm (5000 ft-lbs) of torque required to break the corrosive bonds between the 100 mm heavy hex nuts and...
Tags: service
large
systems
maintenance
Category:Industrial Goods and Services
Latest from this category |
All news |
||||||||||||||||||||||
|
|