• Each Plug-and-Play Structure Weighs over 1,500 Tons; Stretches 44 Meters Long and 24 Meters High<br />
• Modules Will Power Operations and Gas Compression for ZADCO’s Upper Zakum Field<br />
• Utilizes GE’s Unique Module Design Developed for Gorgon; Expands Construction Facility in Italy to Nearly Four Times Its Original Size<br />
<br />
FLORENCE – GE Oil Gas (NYSE: GE) today announced it has received a contract to provide a turnkey turbomachinery solution ...This story is related to the following:Electrical Equipment and Systems Sponsored by: Globtek Inc. - MOBILE BANNER ADTurbomachinery | Power Modules | Hand Driven Electric Generators |