je.st
news
Verrazano Bridge top level closes over falling ice
2015-02-04 22:37:42| Railroads - Topix.net
The MTA ordered the top of the span shut down in both directions at about 1 p.m. and it was unclear when it would reopen. The bottom level remained open.
Tags: top
level
ice
bridge
Category:Transportation and Logistics