je.st
news
Home
›
Watts Bar Refueling Confirmed Following a 48-Minute Core Verification Using the NM200E System ...
Watts Bar Refueling Confirmed Following a 48-Minute Core Verification Using the NM200E System ...
2014-05-20 06:00:00| Industrial Newsroom - All News for Today
NEAR SPRING CITY, TENNESSEE - It did not take long for the refuel crew at the Watts Bar Nuclear Power Plant to get the positive news near the end of the recent April outage. All 193 fuel assemblies were confirmed to be properly aligned following a routine, 48-minute long precision mapping using a NM200E Core Verification System, manufactured by Newton Labs.<br /> <br /> This was the second time the Newton mapping system has been deployed in this Tennessee Valley Authority (TVA) reactor. The ...This story is related to the following:Assembly Verification Inspection Systems
Tags: system
bar
core
confirmed
Category:Industrial Goods and Services
Latest from this category |
All news |
||||||||||||||||||||||
|
|