je.st
news
Tag: sewer
Sewer repair work to close one lane of SW Capitol Highway at SW Terwilliger Boulevard
2014-08-19 01:59:40| PortlandOnline
PDF Document, 76kbCategory: Media
TRAFFIC ADVISORY 08/18/14: Sewer repair work to close one lane of SW Capitol Highway at SW Terwilliger Boulevard
2014-08-19 01:59:40| PortlandOnline
PDF Document, 76kbCategory: 2014 Media Releases
Tags: work
close
repair
traffic
TRAFFIC ADVISORY 8/18/2014: Sewer repair work to close one lane of SW Capitol Highway at SW Terwilliger Boulevard
2014-08-19 01:53:42| PortlandOnline
Tags: work
close
repair
traffic
Kenton Sewer Project Will Begin Construction Soon
2014-08-15 23:41:08| PortlandOnline
Environmental Services will begin construction within a few weeks on the Kenton Sewer Repair Project. This project will replace about 7,000 feet of public sewer pipes that are between 80 and 90 years old and failing due to age. The work will include repairing or replacing about 2,500 feet of existing service laterals that connect houses and businesses from the curb to the public sewer in the street.
Tags: project
construction
begin
sewer
NW Hermosa Boulevard Sewer Repair Project: Sewer Repair Project Planning Underway
2014-08-15 20:19:42| PortlandOnline
Environmental Services is designing a project to repair 100-year old sewer pipes along NW Hermosa Boulevard between NW Macleay and Monte Vista Terrace. The aging pipes are failing and need to be repaired to protect water quality, public health and the environment.
Tags: project
planning
repair
boulevard
Sites : [109] [110] [111] [112] [113] [114] [115] [116] [117] [118] [119] [120] [121] [122] [123] [124] [125] [126] [127] [128] next »