je.st
news
Tag: project
Dept of Interior approves plan for largest solar project in US; 690 MW Gemini Solar with 380 MW battery system
2020-05-12 10:56:13| Green Car Congress
Tags: with
system
plan
project
Project OAR expands with Scripps and ViacomCBS
2020-05-11 15:30:02| Digital TV News
The E.W. Scripps Company and an expanded group from ViacomCBS have joined Project OAR, the consortium working to recommend protocols for TV programmers and platforms to manage, sell and deliver advertising on smart TVs.
Tags: project
scripps
expands
project expands
KIT launches AgiloDrive project on agile production system for electric motors
2020-05-08 12:56:05| Green Car Congress
Tags: system
project
production
kit
System Project Manager
2020-05-08 12:13:16| Space-careers.com Jobs RSS
POSITION ID 3837 ROLE FUNCTION System Project Manager TASKS coordinate the internal external support to PLS Space Segment Development Team, TEC experts, Mission Analysis System Support, Industry coordinate with the Space Segment Development Team where relevant to exchange technical status on the flying and nonflying satellites, identifying coordination issues of relevance and following them to conclusion Support PLS at the regular weekly Operations Boards Support the Operations Teams by providing or facilitating responses to technical support requests from either the Flight Operations Segment FOS or Payload Data Ground Segment PDGS Maintain distribute the PLS OnCall lists to the FOS other parties where relevant in a timely manner Support the Mission Manager and hisher team by providing technical advice related to issues of Satellites performance Support the Space Segment Development Teams by providing timely pertinent feedback on any issue detected inflight with potential impact on satellites still under development provide specific technical expertise to support Performance Monitoring, Analysis Optimisation tasks and Anomaly Investigations, with overall aim to improve mission quality andor lifetime Preparation of Technical Documentation, such as Reports, Technical Notes and other requested documentation Review and synthesis of Technical Reports and documents produced by Industry, and extraction of relevant technical information for use in generation of PLS Performance metrics and reports organise and support the 6monthly Satellite InOrbit Performance SIOP Technical Meetings in cooperation with the Industrial Prime contractor, including associated followup activities eg administration, actions follow up etc respond to Anomaly Warnings received from the Flight Operations Segment FOS in an appropriate timely manner, providing support and facilitating the necessary followon actions Support and lead complex investigations that arise as a result of satellite performance and anomalies, ensuring adequate coordination with involved partners Mission Management, Operations Teams, Industry, Space Segment Development Teams, Management prepare, coordinate followup on engineering requests for the Industrial contractors in support of Anomaly Investigations and other technical analyses support satellite configuration control including the Configuration Control Board CCB support Satellite Decommissioning Disposal activities as required monitor, track and report the status of activities performed by the Industrial contractors in support of the PLS function technical, commercial and schedule status review commercial payment requests the associated justifications submitted by Industry regular milestones or as result of adhoc Cost Reimbursement activities Bring innovation to satellite performance analysis by investigating emerging technologies that enhance the ability for early detection of performance trends and deviations maintain the relevant PLS technical records, databases documentation in accordance with established procedures maintain a regular reporting in coordination with the Technical Officer REQUIRED SKILLS The following skills are requested of all personnel providing support within the service Fluent English language oral and written Autonomy in writing technical notes, specifications and reports in English Good interpersonal skills and team spirit Demonstrable multidisciplinary or systemlevel experience in the satellite engineering domain Previous working experience in a multinational environment is desirable Very good knowledge of MS Office tools. The personnel allocated to these tasks shall have the following key skills University degree in a relevant Engineering discipline Minimum 10 years of experience and a significant background in one or more of the following domains Satellite Operations, Spacecraft Development including Project Engineering, EquipmentSubsystem Procurement, Assembly Integration Test Minimum 3year experience working as a System Engineer or with a System Coordination function in any of the above domains Good understanding of the Satellite Phase E2 Routine Operations Organization and the typical activities performed Good understanding of the factors affecting the short and longterm performance of Satellites and their main subsystems or payloads Proven experience ability at working in an environment with multiple external interfaces Good at working in a team and a proactive attitude to solving problems. GENERAL CONDITIONS START 1 July 2020 END DATE 31 Dec 2021 LOCATION Noordwijk, Netherlands TYPE OF BUSINESS Aerospace WORKING LANGUAGE English DEADLINE 08.05.2020
Tags: system
project
manager
project manager
SDSU to host Zoom meeting Thursday on above-ground burial project
2020-05-06 21:34:00| National Hog Farmer
Bob Thaler says this may be an option now for producers who need to depopulate and dispose due to plant closures from COVID-19.
Tags: project
thursday
meeting
host
Sites : [126] [127] [128] [129] [130] [131] [132] [133] [134] [135] [136] [137] [138] [139] [140] [141] [142] [143] [144] [145] next »