Home Wärtsilä-powered dual-fuel FPSO vessel completes full load tests
 

Keywords :   


Wärtsilä-powered dual-fuel FPSO vessel completes full load tests

2013-01-11 01:00:00| Ship Technology

The P-63 floating production storage and offloading (FPSO) vessel, built at the Cosco shipyard in Dalian, China and powered by Wärtsilä 50DF dual-fuel engines, has completed its full load tests.

Tags: full tests load vessel

Category:Transportation and Logistics

Latest from this category

All news

06.11Hurricane Rafael Graphics
06.11Hurricane Rafael Forecast Discussion Number 10
06.11Hurricane Rafael Public Advisory Number 10
06.11Hurricane Rafael Wind Speed Probabilities Number 10
06.11Hurricane Rafael Forecast Advisory Number 10
06.11Summary for Hurricane Rafael (AT3/AL182024)
06.11Hurricane Rafael Update Statement
06.11Atlantic Tropical Weather Outlook
Transportation and Logistics »
06.11Hurricane Rafael Graphics
06.11Hurricane Rafael Forecast Discussion Number 10
06.11Hurricane Rafael Wind Speed Probabilities Number 10
06.11Hurricane Rafael Public Advisory Number 10
06.11Hurricane Rafael Forecast Advisory Number 10
06.11Stocks and dollar rise as US election result in focus
06.11Hurricane Rafael Update Statement
06.11Summary for Hurricane Rafael (AT3/AL182024)
More »