je.st
news
Tag: code quiz
Code Quiz: Motor and Controller Disconnecting Means
2014-12-18 00:02:30| Electrical Construction & Maintenance
With respect to a motor circuit application, the disconnecting means at the controller location is in sight from and 15 ft from the controller. read more
Tags: code
means
motor
controller
Code Quiz: Ampacity of Generator Conductors
2014-12-04 16:41:00| Electrical Construction & Maintenance
Excluding any exception(s), what is the minimum ampacity of the conductors from the generator terminals to first distribution device containing overcurrent protection? read more
Tags: code
quiz
generator
conductors
Code Quiz: Handhole Enclosure Requirements
2014-11-20 00:05:44| Electrical Construction & Maintenance
With respect to wiring entries, such as a schedule 80 PVC raceway installed underground entering into a handhole enclosure, a schedule 80 PVC raceway shall be mechanically and electrically connected to the handhole enclosure by ______. read more
Tags: code
requirements
quiz
enclosure
Code Quiz: Pull and Junction Requirements
2014-11-06 15:55:00| Electrical Construction & Maintenance
Fill in the blank with the appropriate answer. When installing junction and pull boxes for conductors operating at over 1,000V, the junction or pull boxes shall have sides ______. A. that are spot-welded to form good mechanical and electrical continuity. B. that have concentric or eccentric knockouts. C. (one or more) that are removable. D. that are bonded with a separate bonding jumper. Find the Answer Answer: C read more
Tags: code
requirements
pull
quiz
Code Quiz: RMC Threadless Couplings and Connectors
2014-10-22 20:07:20| Electrical Construction & Maintenance
When installing listed threadless couplings and connectors on rigid metal conduit (RMC), where buried in concrete or masonry, the couplings and connectors shall be ______. read more
Tags: code
quiz
connectors
couplings
Sites : [48] [49] [50] [51] [52] [53] [54] [55] [56] [57] [58] [59] [60] [61] [62] [63] [64] [65] [66] [67] next »